HVAC
Evaporator Capillary Tube Repair
Completed HVAC evaporator-coil work focused on a leaking capillary tube, with close documentation of the coil and refrigerant tubing.
View completed workCommercial building systems
VRF commissioning for installation verification, addressing, controls, test operation, records, and equipment turnover.
Commissioning should connect the installed system to its design and manufacturer requirements. Equipment combinations, piping records, controls, addressing, and test operation need a clear verification scope.
Identify missing documents or unfinished work before scheduling final checks. A commissioning record should state what was tested and any open issues; it should not imply that unverified concealed work or unrelated building systems have been approved simply because the units start.
Recent completed work
See recent repairs documented by our technicians with actual photos of the equipment and completed scope.
HVAC
Completed HVAC evaporator-coil work focused on a leaking capillary tube, with close documentation of the coil and refrigerant tubing.
View completed work
HVAC
Completed HVAC furnace repair with PCB and igniter replacement, documented at the open furnace and lower control compartment.
View completed work
Residential Refrigeration
Filter drier replacement and system flushing on an LG refrigerator sealed circuit.
View completed work
Commercial Refrigeration
TXV valve replacement and a refrigerant-system flush for contamination in a walk-in cooler.
View completed workReady to request service?
Online service request
Share the equipment, location, and preferred appointment window. We will contact you to confirm availability.